Concept Stage
Project Charter / Brief
Stakeholder Register
Scope Statement + Design Brief
High-level Schedule / Milestones
Preliminary Budget Envelope (ROM)
Risk Register (initial)
Governance & Reporting Framework (how you will report cost, change, progress)
Procurement Strategy Recommendation (if relevant)
Optionally (for larger or regulated projects):
Feasibility / Site Study
Preliminary Compliance, H&S, Waste / Sustainability Requirements
Design & Scope Definition
Schematic Design Package Review Report
Verification that design aligns with scope, budget, schedule, operational needs.Design Coordination Log
Tracks architectural, MEP, structural, and specialist consultant integration.Updated Design Brief
Reflects agreed schematic refinements and confirmed user requirements.Material & System Strategy Overview
Preliminary choices with performance, durability, and cost implications.
Cost, Time & Procurement Control
Preliminary Cost Plan (Class 3 Estimate / SD-level BOQ)
Based on schematic layouts, typical details, and system allowances.Updated Master Schedule
With confirmed design durations, approvals, procurement windows, long-lead identification.Long-Lead Item Register
Early warning on items requiring advance procurement to maintain schedule.Procurement Strategy Confirmation
D&B vs Traditional vs CM pathway, packaging strategy, pre-qualification plan.
Risk, Change & Compliance
Updated Risk Register
Design maturity, authority approvals, supply chain, site access, coordination risks.Change Control Baseline
Defines the approved schematic scope as the reference point going forward.Regulatory & Code Compliance Review Summary
Identifies any risks around fire, egress, accessibility, licensing requirements.Sustainability & Waste Minimisation Plan — Concept Issue
Preliminary strategy aligned with materials + methods being selected.
Site & Constructability Assurance
Constructability Review
Ensures schematic choices are buildable → no surprises during detailing.Preliminary Logistics Plan
Touches on site access, hoisting, phasing, noise/work-hour rules.Health & Safety Design Risk Assessment (Early Issue)
Highlights risks inherent in design decisions before DD.
Governance & Communication
Stage Gate Review Report
Confirms SD deliverables meet criteria to proceed into Design Development.Stakeholder Feedback & Resolution Log
Captures comments → tracks closures to maintain alignment.
🔍 Quick Summary for Client-Facing Deck
PM/CM adds value at SD by:
• Holding design to scope, cost & schedule
• Mitigating coordination risks early
• Setting delivery strategy and long-lead protection
• Ensuring constructability and compliance are baked in — not bolted on
Design Coordination & Technical Definition
Detailed Design Coordination Report
Confirmation that architectural, structural, MEP, specialist vendors and FF&E are fully integrated.Model / Drawing Coordination Matrix
Defines responsibilities, interfaces, and submission schedule between consultants.Design Issue & Clash Resolution Log
Identifies conflicts from coordinated drawings/model — tracked to closure.Specifications + Material/Systems Approval Tracker
Ensures selections are approved within cost and delivery constraints.Value Engineering (VE) Log
Cost/performance optimisation options with decision tracking.
Cost, Time & Procurement Assurance
Updated Cost Plan / DD Estimate (Class 2)
Quantity-based estimate aligned with DD drawings and spec — budget validation.Procurement Package Breakdown & Strategy Finalisation
Defined trade packages, scopes, bid schedule, evaluation criteria.Long-Lead & Critical Equipment Approval Report
Design freeze → procurement release for schedule protection.Updated Master Schedule (Design + Procurement + Construction)
All design gates, approvals, lead times and construction milestones integrated.
Risk, Change & Compliance Management
Design Risk Register (DD Version)
Focus on construction risks — structural changes, MEP routing issues, site restrictions.Change Control Log
Documenting scope changes against SD baseline with cost/time impacts.Compliance Certification & Authority Submission Readiness Check
All fire, code, accessibility, hygiene criteria verified pre-permit submission.Sustainability & Waste Minimisation Plan — DD Issue
Specific strategies aligned with technical selections (reuse, reduction, modularity).
Site Execution & Quality Readiness
Pre-Construction Methodology Review
Confirm constructability with planned sequencing, safe access, temporary works strategy.Quality Control Plan (Draft)
Defines inspection points, testing requirements, approval gates for later use on site.Health & Safety Design Review (DD Gate Check)
Ensures CDM-style hazards are eliminated or mitigated within DD.
Governance, Reporting & Stakeholder Management
DD Stage Gate Approval Pack
Client sign-off document confirming design is ready for IFC / tender release.Updated Stakeholder Register & Approval Tracking
Ensures decisions are documented and authority compliance is traceable.
Project Controls & Reporting
Earned Value Progress Reporting (cost + schedule performance)
Weekly / Monthly Progress Reports
Photos, milestones, KPIs, issues, actions, safety, qualityUpdated Master Schedule / Look-Ahead Schedules
Change Control & Variation Review
Cashflow & Payment Certification
Risk Register Updates & Mitigation Tracking
Quality & Technical Assurance
Inspection & Test Plan Management
Quality Assurance / Non-Conformance Tracking
Material Submittal & Shop Drawing Approvals
Mock-ups & Benchmark Sign-offs
Commissioning Strategy & MEP Integration Checks
Safety & Site Management
Health & Safety Compliance Audits
Permit-to-Work & Method Statement Reviews
Site Logistics & Access Control Plans
Environmental & Waste Management Reporting
(Responsible disposal, recycling targets, dust/noise compliance)
Stakeholder & Authority Coordination
Client Progress Reviews & Decision Logs
Authority Inspection Coordination
Operational Readiness Engagement (where applicable)
Project and Construction Management
Bluechip Consultant Services provides professional project and construction management that turns complex builds into smooth, predictable outcomes. Our leadership ensures rigorous planning, coordinated execution, and transparent control — delivering every project on time, on budget, and to the highest standard.
Interior Design Bangkok
We provide comprehensive project and construction management services across Thailand, ensuring every phase of delivery is executed with clarity, control, and confidence. Our experienced team oversees the full development lifecycle—from initial concept and design coordination to procurement, site management, and final handover—maintaining rigorous standards of quality, safety, and compliance throughout.
We proactively manage risk, schedule, and cost to guarantee a smooth process and a successful outcome. With transparent communication and meticulous attention to detail, we minimise disruption for clients while maximising the performance and value of the final build. Whether a new construction or a transformational renovation, we ensure every decision supports the project’s objectives.
Strong leadership. Clear accountability. Built-in delivery certainty.

Why we are different to the rest.
Clear Accountability & Single Point of Responsibility
One coordinated team — reduced client risk and friction.
Rigorous Project Controls & Earned Value Tracking
Performance made measurable — cost and progress always visible.
Structured Change Control Governance
Scope integrity protected with transparent approval and impact analysis.
Proactive Risk Management
Early identification and mitigation for smooth delivery.
Design + Construction Intelligence Combined
Better coordination upfront prevents delays and redesign downstream.
Technical Quality & Compliance Assurance
Standards engineered into every stage of delivery.
Transparent Reporting & Communication
Data-driven clarity for stakeholder confidence and informed decisions.
Health & Safety as a Core Value
Safe operations and regulatory compliance without compromise.
Sustainable Waste & Site Management Practices
Efficient material use and responsible environmental impact.
Local Execution with International Standards
Global delivery maturity — tailored to Thailand’s real-world context.
Critical Path Management
Project and Construction Management

One BKK
Commercial Office Floor plate

Mentawai Surf Residences
Architectural Design

Rouse Retrofit
Commercial Office Turnkey

Asia Wealth Holdings
Commercial Office D&B

Mentawai -Site Office
Architectural Design

Radisson Suites
Hotel Design and Build